Overview

Study tours to the Sellrain Silz hydro power scheme with the Finstertal dam and to the hydro power plants at the Zillertal with the 186m high Zillergruendl arch am will be offered on two days: pre study tours on 21st Sept. and post study tours on 24th Sept. 2010.

 

 

 

 -  Technical Excursion 21st of September 2010 - Finstertal

      please book in our Conference Adminstration Tool Set (starts on 10th February 2010)

finstertal

 

Finstertal (ER)

Completed 1980
H = 150 m
Hcore = 96 m
VRes = 62 * 106 m³
finstertal
  
finstertal
  
finstertal

 

 

 -  Technical Excursion 24th of September 2010 - Zillergründl

      please book in our Conference Adminstration Tool Set (starts on 10th February 2010)

 zillergruendl
  

Zillergründl (VA)

Completed 1986
H = 186 m
VRes = 89,5 * 106 m³
 zillergruendl
  
 zillergruendl
 
 zillergruendl
  
  

 

 