OverviewStudy tours to the Sellrain Silz hydro power scheme with the Finstertal dam and to the hydro power plants at the Zillertal with the 186m high Zillergruendl arch am will be offered on two days: pre study tours on 21st Sept. and post study tours on 24th Sept. 2010.
- Technical Excursion 21st of September 2010 - Finstertal please book in our Conference Adminstration Tool Set (starts on 10th February 2010) - Technical Excursion 24th of September 2010 - Zillergründl please book in our Conference Adminstration Tool Set (starts on 10th February 2010)  | | | | Zillergründl (VA)Completed 1986H = 186 mVRes = 89,5 * 106 m³ |  | | | |  | | |  | | | | | | |
|